• No moisture limit!  Water-Proof!
  • Documented ASTM testing NOT required!
  • Resistant to concrete bath solutions of pH 13-14!
  • Claims are independently verified, ref. available
  • Floor prep? - just grind (shot-blast not required)
  • "Walk-On-Work" application - trowels included with purchase
  • One part, no mixing, no odor, no solvent, just trowel and go
  • Fast cure, foot traffic in <3hrs!  Perfect for occupied space
  • Primerless adhesion to wet concrete or green concrete
  • Save $1,000's by avoiding closures to retail space
  • Raw materials derived from sustainable, bio-based sources
  • GREEN – "0: VOC's, LEED, CHPS and REACH (EU)
  • GAME CHANGER!!!

7 years ago we offered the industry Hydro-Seal, the first 8lb adhesive. Then we engineered Hydro-Seal Primer & Membrane (vapor suppressants) to work in synergy with Hydro-Seal adhesives.  This extending moisture resistance to an unheard of 12lbs MVER. Now after 5½ years of development work we are proud to introduce the first water-proof adhesive to solve moisture related adhesive bond failures once and for all.
Immersive test conditions:
2mm rubber flooring approx. 4"sq
Wonderboard approx. 8"sq
Trowel notch 1/16" x 1/32" x 1/32" U-notch
Test solution: adjusted to pH 14 with NaOH
Electrolytes: adjusted with NaCl
Flash time allowed before immersion: 10sec
Immersion time before cure test:  30min
Immersion time prior to pull test: 72hrs
Results: Primary Substrate Failure

email me
Tell a friend about this page
Aquaflex vs 2-Part Moisture Mitigation Sealants
Comparative Study -Cost/Time of Installation
Loss of Revenue from Store Closure - the Hidden Cost Few Calculate
FREE! - certified training from the best Independent consultants in flooring
Time is $MONEY$.  Check this comparison...
Any sufficiently advanced technology is indistinguishable from magic. - Arthur C Clarke
Before you commit to a 2-part MMS, let us do a test patch at our cost.  You have nothing to loose and seeing is believing.  On the upside; you could save over $2.00/sf, avoid any loss in revenue from shutting the building down and delivery the project on time. - the Formulator